• At IPR Oilfield Services our mission is to provide the latest technology and methodologies to the oil and gas sector in the Middle East Region specifically focused within Egypt.
  • Our professional engineering, management and field service is dedicated to our clients in a joint effort to drive down costs of exploration and development accomplished  through the use of innovative thinking and creative application of the latest industry advancements and purpose built equipment.
  • IPR will perform our services with honesty, integrity, pride and above all else safety

Rig 1

MAST
125’ Double section, hydraulic telescope API Spec. 4F
Max. static load 401,400 lbs.

SUBSTRUCTURE
Drill floor height 19.7’
Setback 9840 ft. 5” DP
Max. load 401,400 Lbs.

TRAVELING HOOK
Model YG-180
Max. capacity 401,400 Lb.

DRAWWORKS
Double drum with Eaton 324WCB2 with auxiliary brake
624,440 Lb Max. pull
1 ¼” Drill line

PUMPS
(2) F1000, 1000 Hp each.
P/B Cat 3512 1250 Hp ea.

POWER
(2) Caterpillar C15 540 bhp.
400 KW Gen-Set Volvo 1641
(1) 300 KW Volvo, camp genset
104 KW Gen-Set Volvo

ROTARY TABLE
ZP 205, 20.5” opening
300RPM
drum with Eaton 324WCB2 with auxiliary brake
624,440 Lb Max. pull
1 ¼” Drill line

SOLIDS CONTROL SYSTEM
Total volume 1750 Bbl.,5 Tanks
(2) Linear s. shaker 660 gpm ea.
Degasser max rate 1057 gpm
Desander max rate 881 gpm
Desilter max rate 881 gpm

BOP
13 5/8” 5000 PSI Annular
13 5/8” 5000 PSI Double

ACCUMULATOR
5000 psi

CHOKE MANIFOLD
5000 PSI
Model JG35

DRILL PIPE
3 ½” G-105 13.3#, 10,000’
5” S-135, 19.5#, 10,000’
HWDP 3 ½”, 25.3#, 32 JTS.
HWDP 5”, 49.5#, 32 JTS.

DRILL COLLARS
4 ¾ X 2 ¼” Spiral, 24 JTS.
6 ½ X 2 13/16” Spiral, 24 JTS.
8.0 x 3.0” Spiral, 24 JTS.

AUXILIARY EQUIPMENT
60 Man Camp
Fishing Tools

FOOTPRINT
Location size with camp
300’ x 150’

Rig 2

MAST
104’ Double section, hydraulic telescope API Spec. 4F
Max. static load 202,000 lbs.

CARRIER
8 X6
Traveling dimension 59’ x 9.5’ x 14’

SUBSTRUCTURE
Drill floor height 10.2’
Setback 13,120 ft.2 7/8” tubing
Max. load 200,250 Lbs.

TRAVELING HOOK
Model TC-90
Max. capacity 202,000 Lb.

DRAWWORKS
Single drum with ATD 324H
350 Hp
624,440 Lb Max. pull
1” Drill line

POWER
Caterpillar C9 350 Hp

ROTARY TABLE
ZP 135, 11.5” opening
300RPM

BOP
7 1/16” 3000 PSI Double

ACCUMULATOR
3000 psi
20 gal.

CHOKE MANIFOLD
4” 3000 PSI

PIPE HANDLING
Manual tong 2 7/8”, 3 ½”
Power tong 2 7/8”, 3 ½”
6000 Ft-lb
Tubing handling equipment
Sucker Rod handling equip.

Other Service Offerings

Chemicals

Production and Water Injection Chemicals

Learn More

Polymers

Technology for Water Shutoff & Water Diversion

Learn More

HSE Responsibility Program

IPR Oilfield Services has a comprehensive HSE program first compiled by professional third party specialists.

Process:
New employee orientation at the office level reviewing HSE policy, documentation, pre-screening and training.

Prior to field operations, IPR on-site HSE supervisors continue new employee training and orientation prior to engaging in actual work processes. The orientation involves hazard identification, site inspection, documentation training, and discussions of expectations with on site staff.

HSE for the seasoned team involves daily toolbox meetings, monthly training on site and monthly training at the Cairo offices. IPR maintains a matrix to track all employees are receiving all training courses required through the course of the year.

STOP program is implemented and a safety culture is maintained from the top down.

A culture of safety is of paramount importance to our company and we firmly believe each and every member of our organization has the right to a productive and safe environment and returns home without injury to their family each night.  Health and Safety is an integral part of our daily operational routine. Equipment  IPR equipment is  API certified and IPR employs routine and rigorous inspection procedures to maintain API compliance.

Environment.  IPR crews are trained to maintain a clean, trash free location, report and mitigate any spills or leaks immediately and maintain efficient operations to contain drilling fluids and cuttings.  IPR uses new, fuel efficient equipment with daily consumption levels 50% lower than larger sized equipment routinely employed to perform the same drilling or well maintenance tasks.